← All videos

Industry Insights

Heat Pump Sizing: Why Manual J Comes Before Equipment Selection | HVAC

About this video

Watch on YouTube ↗

Proper heat pump sizing starts with understanding the building—not simply matching the tonnage of the HVAC equipment being replaced. This video explains why residential HVAC contractors and building-performance professionals should evaluate the home’s heating and cooling loads before selecting a heat pump. Learn how building characteristics such as insulation, windows, air leakage, outdoor design conditions, ventilation, duct location, and planned envelope improvements can influence heating and cooling requirements. We also explain the relationship between a Manual J load calculation and heat pump equipment selection, why air sealing and insulation improvements should be coordinated with HVAC design, and why ductwork, airflow, static pressure, commissioning, and post-installation verification matter. For energy auditors, HVAC contractors, weatherization professionals, HERS raters, home-performance contractors, and building-science professionals, the central principle is simple: Understand the building → Calculate the load → Select the equipment → Verify the installation. BPMS™ is developing connected building-performance workflows that bring building information, field documentation, HVAC analysis, WorkScopes, and reporting together in one ecosystem. Learn more at BPMSCloud.com.

Originally uploaded

Explore more videos →